80,000 t/year
253,230㎡ · 8 Pyrolysis + 4 rCB sets
Active + rCB Refinery
Gangjin owns the overall process design and supplies the main equipment package outside the reactors, coordinating engineering with the civil contractor on site. The scope continues through commissioning and operational handover.